AD-10 Polyurethane Insulation
PRODUCT DESCRIPTION
It is a one-component, elastic, polyurethane-based waterproofing material suitable for light pedestrian traffic with high insulation and adhesion properties.
SCOPE OF APPLICATION
In the insulation of roof, terrace and foundation curtains,
Wet floors, bathrooms and kitchens,
In grass terrace and flower bed waterproofing,
On the sandwich panel,
dilation points,
In the isolation of water tanks and pools,
In hidden streams and metal streams,
in waterways,
Bridges, viaducts, tunnels,
In protection applications for insulation purposes of surfaces such as metal, concrete, artificial stone, wood, cork,
It is used in electrical insulation.
FEATURES
It has high adhesion strength in initial and final adhesion.
It is resistant to simple acids.
Since it creates a soft structure on the applied surface, it softens the impact sounds.
It can be applied with a file.
It is UV resistant.
It is a soft elastic material.
Its insulation is suitable for floors with underfloor heating.
It is compatible with high temperature differences. ( - 20/ + 90 °C )
It is frost resistant.
It has crack sealant and dilatation filling feature.
Usage time: 30- 45 minutes (air temperature, ground temperature and humidity affect drying time)
Drying time (at 25 °C): 12 hours
Full Dry: 7 days
APPLICATION
During the application of the DUAYEN AD-10 insulation material, the surface to be applied must be a clean, dry, oil-free, repaired surface. Priming should be applied to the floor first. When choosing a primer, it should be determined whether the floor is exposed to moisture. DUAYEN AS-148 epoxy moisture barrier should be preferred for floors exposed to very light moisture. DUAYEN AS-142 polyurethane two-component floor primer or AS-144 polyurethane one-component floor primer should be applied on normally dry floors. After the priming process is completed and the floor dries, insulation material should be applied. Before using the product, it should be mixed thoroughly, and it should be applied to the floor with the help of a roller or brush. Although the first start of drying occurs within 3 hours, drying takes place after 24 hours. Drying time may vary depending on temperature and humidity. In areas with low humidity, the drying time may be increased by 50%. Chamfer points can be applied together with the general area. It fully gains its chemical resistance after 7 days. Safe working conditions for the application are between +5°C and +30°C, and the temperature of the floor to be applied should be 3°C above the dew point in the area.
APPLICATION TOOLS
Application can be done with a roller or brush.